Tech Log Fuel Calculation
Arrival Fuel
LH Tank (Kg):
CTR Tank (Kg):
RH Tank (Kg):
Arrival Total (Kg):
Requested & Calculated Fuel
Total Fuel Requested (Kg):
Specific Gravity (SG):
0.75
0.76
0.77
0.78
0.79
0.80
0.81
0.82
0.83
0.84
0.85
Plan Uplift (Ltr):
Plan Uplift (Kg):
Actual Uplift
Uplift (Ltr from Receipt):
Uplift (Kg):
LH Tank (Kg) After Uplift:
CTR Tank (Kg) After Uplift:
RH Tank (Kg) After Uplift:
Post Uplift Total (Kg):
Final Checks
Arrival Total + (Actual) Uplift (Kg):
Difference (OM.A 8.2.1.3 Uplift Check):
Reset All Fields